KGIS wins Citybus contract to deploy an integrated bus logging and automatic bus stop announcement system across its fleet of 745 buses in Hong Kong. Click here to find out more.

KGIS has considerable experience in the bid management process from bid strategy formulation and the pre-qualification process to tender preparation, and submission of formal proposals and bid documents.
We plan every aspect of a project before hand, giving you a detailed time schedule and rollout plan which includes the following points:

Identification of resource requirements (list of test pre-requisites, roles and responsibilities)
Test plan and timescales
Testing standards
Individual test levels (inputs required; outputs expected; test items and methods)
Hardware configuration
Software, data and interfaces
Specialist tools, test and measuring instruments
Procedures and recovery actions to be followed if test cannot be run as specified
Tracking procedures to keep track of all testing, defects and fault correction actions
System acceptance and test sign-off
We provide you with a range of technical documentation to accompany each project, the scope of which is usually agreed during the briefing stage and typically includes:

Design and System Specifications
Project Management Plans
Installation Method Statements
Test Results
Training Materials
User and Operational Procedures
Maintenance Plan